Finished

This house will probably never be "finished" but the installation of the mouldings which the last post was about is now finished, anyway. There were 27 section of moulding, each about 2.4 metres long, it went into the passageway, a stair vestibule and another small vestibule which connects to the end of the main passageway.

Below are a few pictures of the results.

Stair vestibule

A joined corner

Small vestibule
The pattern had to be cut down and joined in the middle in order for the
corners to meet up properly

Another view of the small vestibule

One end

The other end.
The possibility of the corners in both ends lining up was very low and
creative sculpture work had to compensate for the fact that the pattern
did not line up nicely

However, the overall view of it looks fine.

A reminder of what it looked like before this round
And how it looks now (from the opposite end)